Site Notes: The pad is in the front car park of the hospital, the area slopes from rear to front of the trailer when reversed in.
There is mains power but an extension lead is required. There is a tray in place to route all cables.
Align Steps: In Line
Power Cabinet Code: Missing Info
Services To Connect: Power, VOIP (Telephone data cable), Data/Pacs
Leweden Cable Required: Missing Info
Extension Cable Required: Yes
On Site Parking: Yes
Water Available: Missing Info
Requires Cable Guards: Yes
Cable Guard Notes: 3 cable guards needed over power cable for patient access
1 cable guard needed by wooden gate where power cable runs along
DRIVER FACILITIES
Missing Info
You can request an edit to this site using the form below
Please attach pictures where possible
ALL DONE
Thanks for your input
Smit MRI Rear Barrier
Some of the newer Smit MRI’s now have a rear barrier that MUST be raised as part of the setup and lowered for transport. Any problems must be reported to transport before leaving site