Bodmin Community Hospital

This site map is a draft copy and may not be complete, please use the form below if you can supply any missing information.

Client: Inhealth
Last Updated on: Wednesday, 13 March, 2024
Address:
Bodmin Community Hospital, Boundary Road, Bodmin PL31 2QT, UK

The address above maybe for the entrance of the site and may not be the postal address.

What 3 Words:

Missing Info

Best Approach:
Hospital is accessed via A30/A389. If coming in from the East (travelling Westbound) and take the turn off for the town centre (A38)you should follow signs around weight restriction. Alternative route is to stay on A30 and take A389/A391 exit (see access map) From A389 turn into Boundary Road, hospital entrance is located 100 yards on right hand side. Follow driveway up the hill until pad is on right hand side. There are 2 options for positioning the scanner, awaiting site/IH preference. If option 1 (parallel with kerb) drive onto pad from driveway and pull through pad before reversing into position. If option 2 (across the pad) drive onto pad from drivewayand pull through pad, turn scanner round and drive back onto pad so facing back out towards driveway (scanner at an angle to pad)

SITE NOTES 

Site Restrictions: None
Site Notes: 2 x power boxes located on building to rear of pad, 20 metre extension lead required (both options)
2 x data/phone boxes located to left of power boxes, each containing 3 x RJ45 ports
2 x water taps next to power boxes, understand 1 x grey water drain
Align Steps: In Line
Power Cabinet Code: Missing Info
Services To Connect: Power, Data/Pacs
Leweden Cable Required: No
Extension Cable Required: No
On Site Parking: Yes
Parking Details: Off side of trls
Water Available: No
Requires Cable Guards: Yes
Cable Guard Notes: one on site

DRIVER FACILITIES

WC, Canteen, Vending Machines

You can request an edit to this site using the form below

Please attach pictures where possible

ALL DONE

Thanks for your input

Smit MRI Rear Barrier

Some of the newer Smit MRI’s now have a rear barrier that MUST be raised as part of the setup and lowered for transport.
Any problems must be reported to transport before leaving site